Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

CORDEX Africa

Scientists from all over the world are working on the African modeling domain. The different groups are employing different regional climate models as to establish a common ensemble of climate projections as large as possible.

...

An evaluation run was performed by KIT Karlsruhe using ERA-Interim data (Dee et al., 2011) as boundary forcing for the time period 1989 - 2008. To establish an ensemble of climate projections different forcing GCMs and scenarios listed in the table below were employed.


GCM

Historical

1950 -2005

RCP 4.5

2006-2100

RCP 8.5

2006-2100

MPI-ESM-LR  r1

KIT - published

KIT - published

KIT - published

HadGEM2-ES  r1

KIT - published

KIT - published

KIT - published

CNRM-CM5  r1

KIT - published

KIT - published

BTU - published

EC-EARTH  r12

KIT - published

KIT - published

KIT - published

Model Setup


Version: int2lm_090213_1.9_clm3/ cosmo_090213_4.8_clm17

...

For CORDEX-CORE simulations will be performed with cosmo5.0_clm15 with a resolution of 25 km (AFR-22)



Forcing

evaluation

1979-2010

int2lm

configuration

cclm

configuration

ERAInterim

KIT - runningAFR-22 setup ERAINT (1)


Model setup

Version: iint2lm_131101_2.00_clm4 / cosmo_131108_5.00_clm15

...

AFR-22 setup ERAINT(1): OUTPUT_CORDEX_CORE_AFR22_Tegen_ERAInterim_int2lm_131101_2.00_clm4 (You are not authorised to download.)



GCM

Historical

1950 -2005

RCP 2.6

2006-2100

RCP 8.5

2006-2100

int2lm

configuration

cclm

configuration

MPI-ESM

KIT - in preparation

KIT - planned

KIT - planned

AFR-22_INT2LM-204-4_CLMcom-KIT-CCLM5-0-15_01_config.tar

AFR-22_CLMcom-KIT-CCLM5-0-15_01_config.tar

HadGEM2

KIT - planned

KIT - planned

KIT - planned



NorESM

KIT - in preparation

KIT - planned

KIT - planned




Dee, DP et al., 2011: The ERA-Interim reanalysis: configuration and performance of the data assimilation system. Q J R Meteorol Soc, 137(656), 553-597

...