Again, an evaluation run was performed by BTU Cottbus using ERAinterim data (Dee et al., 2011) as boundary forcing for the time period 1989 - 2008.
Model Setup
- 0.44 simulation
- Version: int2lm_v1.10_clm9 / cosmo_090213_4.8_clm_17
- Configuration outputs of the ERA-Interim driven simulation:
- COSMO-CLM YUSPECIF (You are not authorised to download.)
- INT2LM OUTPUT (You are not authorised to download.)
...
High resolution runs at 0.11° (approx. 12 km) - Model Setup
Model Setup
- Version: ??? / cosmo_131108_5.00_clm6
- Configuration outputs of the ERA-Interim driven simulation:
- COSMO-CLM YUSPECIF
- INT2LM OUTPUT
- An evaluation run is planned by the Wegener Center using ERAinterim data (Dee et al., 2011) as boundary forcing for the time period 1989 - 2008.
...
Low resolution runs at 0.44° (approx. 50 km) - Model Setup
Model Setup
- Version: ??? / cosmo_131108_5.00_clm6
- Configuration outputs of the ERA-Interim driven simulation:
- COSMO-CLM YUSPECIF
- INT2LM OUTPUT
...