Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • 0.11 simulation
  • Version: int2lm_v1.10_clm6 / cosmo_090213_4.8_clm_17
  • Configuration outputs of the ERA-Interim driven simulation:
    • COSMO-CLM YUSPECIF (not yet available)
    • INT2LM OUTPUT

...

    • (not yet available)

Runs at 0.44° (approx. 50 km)

Again, an An evaluation run was performed by BTU Cottbus using ERAinterim data (Dee et al., 2011) as boundary forcing for the time period 1989 - 2008.

...

  • 0.44 simulation
  • Version: int2lm_v1.10_clm9 / cosmo_090213_4.8_clm_17
  • Configuration outputs of the ERA-Interim driven simulation:
    • COSMO-CLM YUSPECIF (You are not authorised to download.not yet available)
    • INT2LM OUTPUT (You are not authorised to download.not yet available)

Simulations performed or planned by the CLM-Community with CCLM-5-0-6

...

Runs at 0.11° (approx. 12 km)

...

GCM

Historical

1950 - 2005

RCP 4.5

2006-2100

RCP 8.5

2006-2100

RCP 2.6

2006-2100

MPI-ESM-LR r2

Wegener Center - planned



Wegener Center - planned

...

  • Version: ??? / cosmo_131108_5.00_clm6
  • Configuration outputs of the ERA-Interim driven simulation:
  • COSMO-CLM YUSPECIF
  • INT2LM OUTPUT
  • An evaluation run is planned by the Wegener Center using ERAinterim data (Dee et al., 2011) as boundary forcing for the time period 1989 - 2008.

...

Runs at 0.44° (approx. 50 km) - Model Setup

An evaluation run was performed by ETH using ERAinterim data (Dee et al., 2011) as boundary forcing for the time period 1979 - 2000.

...