...
- 0.11 simulation
- Version: int2lm_v1.10_clm6 / cosmo_090213_4.8_clm_17
- Configuration outputs of the ERA-Interim driven simulation:
- COSMO-CLM YUSPECIF (not yet available)
- INT2LM OUTPUT
- COSMO-CLM YUSPECIF (not yet available)
...
- (not yet available)
Runs at 0.44° (approx. 50 km)
Again, an An evaluation run was performed by BTU Cottbus using ERAinterim data (Dee et al., 2011) as boundary forcing for the time period 1989 - 2008.
...
- 0.44 simulation
- Version: int2lm_v1.10_clm9 / cosmo_090213_4.8_clm_17
- Configuration outputs of the ERA-Interim driven simulation:
- COSMO-CLM YUSPECIF (You are not authorised to download.not yet available)
- INT2LM OUTPUT (You are not authorised to download.not yet available)
- COSMO-CLM YUSPECIF (You are not authorised to download.not yet available)
Simulations performed or planned by the CLM-Community with CCLM-5-0-6
...
Runs at 0.11° (approx. 12 km)
...
GCM | Historical1950 - 2005 | RCP 4.52006-2100 | RCP 8.52006-2100 | RCP 2.62006-2100 |
---|---|---|---|---|
MPI-ESM-LR r2 | Wegener Center - planned | Wegener Center - planned |
...
- Version: ??? / cosmo_131108_5.00_clm6
- Configuration outputs of the ERA-Interim driven simulation:
- COSMO-CLM YUSPECIF
- INT2LM OUTPUT
- An evaluation run is planned by the Wegener Center using ERAinterim data (Dee et al., 2011) as boundary forcing for the time period 1989 - 2008.
...
Runs at 0.44° (approx. 50 km) - Model Setup
An evaluation run was performed by ETH using ERAinterim data (Dee et al., 2011) as boundary forcing for the time period 1979 - 2000.
...